Tunnel Ovčiarsko
Implementation of the complete primary and secondary lining of the Ovčiarsko tunnel
Surveying works
URANPRES, s.r.o. carries out surveying works in its own direction in all phases of projects. From preparatory work to post-construction survey.
GALMUS – hydrogeological borehole GCH – 10B
Drilling of hydrogeological borehole GCH – 10B to a depth of 60 metres at the Galmus site to provide drinking water for the village of Bystrany